HAS Operation Site Trainning - Guangzhou Hotlink Hardware Co. Ltd
HOME » VIDEO » HAS Operation Site Trainning

Blog HAS Operation Site Trainning

HAS Operation Site Trainning

HAS Operation Site Trainning

01-Mar-2017

Before using HAS splice, the operator should peel suitable length of conductor, use tools to clean & repair tip of conductor to smooth, then catch the conductor insert into the splice for connection. when the operator hear a voice of "ka-la" means the connection operation is half done. then the operator should try to pull out conductor from splice to exam the result of connection work.

In the video, HAS shows very strong features of easy train to use, easy operation with stable/reliable connection for overhead power conductor.


Leave A Comment

Verification code